08-20-05

 

 

Made the set of Aluminum bushings for both Ailerons precisely the needed length.

 

Deburred and primed both Aileron Gap Fairings.

 

 

Clecoed and began the riveting.

 

Taaa Daaa!  Left Wing.

 

And Right Wing.

 

 

 

Back Home Next