
I can see that finishing the QB Wings isn't going to take very long but I'm excited with the work left that needs to be done.
I drilled and fitted the wiring conduit to the right wing today using the same procedure as before.
To install the Bellcranks in both wings requires trimming of both bushings to the correct length and removing the upper
bracket to install the pivot bolt.

So out comes the bracket.

The bushings also needed drilling slightly to aquire the 1/4" diameter as well as cleaning up the Bellcrank hole so they would
pivot freely. Batta bang batta bing. There you have it, both Bellcranks installed.

