12-24-05 Install Engine mount on firewall.
12-27-05 Engine arrives via courier.
12-30-05 Installed Exhaust and checked Carb/Cable alignment.
01-01-06 Installed valve cover cork gaskets with Silicone Gaskets.
01-02-06 Started working on the "BAFFLING BAFFLING"
01-21-06 Made a few Steel Braid hoses for fuel supply and pressure.
02-05-06 Fitted Alternator and machined mounting bracket.
02-20-06 Drilled all Engine control cables through firewall and installed heat shields.
03-08-06 Baffling almost near completion. This page is HUGE! Lots of pics!!!!
03-18-06 Carbon Fiber lay up marathon featuring Jim Andrews.
03-19-06 Trimmed basic shape of new Carbon Plenum top.
03-23-06 Began mod to upper plenum. Adding inlet ramps so that the transition between the cowling
and baffling will be seamless.
03-28-06 Completed the right side ramp and ordered PTM-W High Temp Epoxy.
04-01-06 Formed left side ramp and installed Stainless Steel wire pass throughs with gromments.
04-04-06 Painted plenum part with Enamel to aid in mold release.
04-07-06 Installed Spark Wire insulators and formed Plenum Mold.
04-10-06 Layed up first new Plenum part using the new Mold.
04-12-06 Trimmed new Plenum, sanded edges and drilled holes.
04-13-06 Received new Ed Sterba Prop bolts and crush sleeve from Saber Manufacturing.
04-23-06 Machined Copper shims for CHT probes and installed EGT probes.
05-03-06 Primed completed baffling.
05-04-06 Painted completed baffling.
05-09-06 Primer attachment line and fitting arrived from Superior Air Parts.
05-10-06 Fitted Air Box base plate and aligned filter base plate.
05-13-06 Built new Air Box top plate and glassed filter cover and carb inlet duct.
05-14-06 Installed Heat Muff valve.
06-04-06 More work on Airbox, installed manifold pressure fitting.
06-05-06 Installed Carb Heat flange on airbox and cable.
COWLING Section
01-22-06 Began upper cowling installation and trimming.
02-04-06 Fabbed the flange that mount Camlocs for the upper Cowling.
02-11-06 More work on flange for Camlocs from MilSpec.
02-16-06 Installed lower cowling and hinge material on both sides.
02-22-06 Assembled lower Cowling support bracket and installed.
06-22-06 Added Super Fill and a layer of glass to inlet hole (balloon trick)
08-05-06 Trimmed aft end of Cowling to provide Spinner clearance.
08-06-06 Installed CamLocs and trimmed aft edge of new Spinner.
PROP and SPINNER
06-10-06 Installed Saber Manufacturing spacer and Ed Sterba Prop.
06-13-06 Made pattern of prop hub and cut spinner for initial fit.
06-17-06 Drilled spinner to mounting plates and added rear covers.
07-30-06 Doug Reeves from Vans Airforce . Com donates a piece of his "Flash"
PLENUM PROJECT
07-03-06 More R&D with Plenums, this one was a test of vacuum bagging using glass and Kevlar.
WHEELS AND FAIRINGS
07-06-06 Installed tires on wheels and wheels on gear.
08-20-06 Right Wheel Fairing fitment.
08-21-06 Left Wheel Fairing fitment and alignment of both with Fuselage.
08-22-06 Drilled last mounting points on rear Fairings.
08-26-06 Reinforced mounting points and balanced Main Wheel Fairings.